Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Table of Contents
stylenone

...

To streamline supply planning, maintain a single warehouse named Main.

Bins

...

Bins

For simplicity, create one of the following virtual bins required by the system, even when there are two buildings:

...

  • A000-A999

  • B000-B999

  • C000-C999

  • D000-D999

  • E000-E999

  • F000-F999

  • G000-G999

  • H000-H999

  • I000-I999

  • J000-J999

  • K000-K999

  • L000-L999

  • M000-M999

  • N000-N999

  • O000-O999

  • P000-P999 (Replaced by the one Input bin.)

  • Q000-QN999 (Replaced by the one QC bin)

  • R000-R9999

  • S000-S999 (Replaced by the one Input bin)

  • T000-T999 (Replaced by the one Input bin)

  • U000-U999

  • V000-V999 (Replaced by the one Input bin)

  • W000-W999 (Replaced by the one Input bin)

  • X000-X999 (Replaced by the one Input bin)

  • Y000-Y999 (Replaced by the one Ship bin)

  • Z000-Z999

Shelves to Create

  • P000-P999

  • S000-S999

  • T000-T999

  • V000-V999

  • W000-W999

  • X000-X999

Input Bin Shelves

Input Bins

Yakta

Department

Input Bin

Shelves

Assembly

Input

YT001 to YT999

Powder

Input

YP001 to YP999

Welding

Input

YX001 to YX999

Quality

Input

YQ001 to YQ999

Input Bins

Arrowquip

Department

Input Bin

Shelves

Assembly

Input

T001 to T999

Fab

Input

W001 to W999

Parts Studio

Input

V001 to V999

Powder

Input

P001 to P999

Raw Steel

Input

S001 to S999

Quality

Input

Q001 to Q999

...