User Setup

...

  • Work Center

...

  • Field: This must

...

  • remain blank for users to see all routing steps.

...

Picking Ticket Function

...

  • Picking Ticket Function: Required for Work Orders.

image-20241007-170049.png

Work Order Setup

  • Product Stage and

...

  • Ingredient

...

  • Fields: Must be updated manually.

System will populate Batch No. automatically.

image-20241007-170212.pngImage Removed

image-20241007-170541.pngImage Removed

image-20241007-170556.pngImage Removed

How to Scan Input and Output

image-20241007-170309.pngImage Removed

image-20241007-170722.pngImage Removed

image-20241007-170800.pngImage Removed

image-20241007-170801.pngImage Removed

Should scan Work Order #  

Then display just the one routing step that needs to be worked on now.

Either the first step, or the first routing step with the previous step status = finished. Done

save,

image-20241007-170823.pngImage Removed

image-20241007-170851.pngImage Removed

image-20241007-170919.pngImage Removed

image-20241007-171219.pngImage Removed

new to enter a new container

  • The Container # is not scanned before for this work order Done 

  • Total Output Qty for all containers cannot be more than input quantity of the routing step. Done 

When scanning input container 

  • Can you display container # below Scan Input Container line? Done 

  • Check to make sure the scanned container belong to the same work order Done 

  • There could be multiple input containers Done 

  • When clicking output button, make sure all containers are scanned for input, except for the first routing step. Done 

  • Note:

    • Ensure all scanned containers belong to the same work order

    • Multiple input containers may exist

    • Display an error if not all containers for the work order are scanned

  1. Notes:

    • Multiple input/output containers may exist

    • Can scan user information or manually enter user details

    • Raw materials are consumed automatically based on standard setup (no need to scan raw materials)

    • Lot Number will be assigned at the last step of the routing process

...

If Pick Status != Full, error when trying to post Routing Step output.

...

image-20241007-171356.pngImage Removed

image-20241007-171414.pngImage Removed

image-20241007-171429.pngImage Removed

image-20241007-171446.pngImage Removed

image-20241007-171515.pngImage Removed

image-20241007-171531.pngImage Removed

image-20241007-171554.pngImage Removed

image-20241007-171623.pngImage Removed

image-20241007-171734.pngImage Removed

Objective: Split the existing data entry page into two separate pages for more efficient input and output tracking.

image-20240906-121219.pngImage Removed

    • Product Stage: Default to O.

    • Product Ingredient: Default to S.

...

  • Batch Number: Automatically generated in the system during Work Order creation.

    • Format: Three digits (e.g., 001, 002, etc.).

    • Resets: At the start of each year.

    • Assignment: Automatically assigned when a new Work Order is created.

    • It can be viewed and updated on the list view.

...

Picking and Scanning Process

  • Must create and register pick before scanning.

...

  • Pick Status: Must be "Full" before scanning; otherwise, an error will occur.

...

First Step (Output Scanning):

image-20241007-170309.pngImage Added

Scan the Work Order to display the current routing step.

...

  • Click the Output button, scan Container No. and Quantity, and then:

    • If there are no additional output containers, click Save.

    • If you need to add more, click Save and New.

  • Note for Mobile Users: Previous values will remain visible. Make sure to click on each field to update the values for the new container before saving.

image-20241019-111658.pngImage Added

  • After you finish scanning all output container, click Save.

image-20241019-111840.pngImage Added

  • All input and output containers are stored in the Register Work table, with output containers also stored in the Output Container table.

image-20241019-111944.pngImage Added

Posting Inventory:

  • Click the Post button to consume inventory.

  • The next routing step is displayed automatically.

...

Input Scanning (except the First Step):

  • Click the Input button to scan the input containers from the previous routing step.

  • Must scan all containers used in the previous step.

  • System will display all scanned container numbers.

image-20241019-112129.pngImage Added

image-20241019-112152.pngImage Added

Output Scanning:

  • Click Output to start scanning output containers and enter quantity.

  • The total quantity of output containers must not exceed the total input quantity for that step.

  • For multiple output containers, click New before scanning additional containers.

...

image-20241019-112353.pngImage Added

image-20241019-112513.pngImage Added

Lot Number Assignment:

  • Lot Number is automatically assigned during output posting of the last step.

...

Design - Page 1: Input Data Collection

  1. Line Clearance from QA

    • Verified by: User input or barcode scan

  2. Process Start/End Time

    • Start and End timestamps for the process

  3. Who Performed the Task

    • Logged by: User input or barcode scan

  4. Secondary Signoff Verification

    • Verified by: User input or barcode scan for task completion

  5. Work Center Cleaning Start/End Time

    • Track start and end times of cleaning

  6. Who Performed Work Center Cleaning

    • Logged by: User input or barcode scan

  7. Secondary Signoff for Cleaning

    • Verified by: User input or barcode scan for equipment cleaning

  8. Scan Input Container

...

Design - Page 2: Output Data Collection

  1. Scan Output Container

  2. Enter Output Weight/Volume

  3. Date/Time of Output Creation

    • Automatically captured by the system.

  4. Who Performed the Task

    • Logged by: User input or barcode scan

  5. Secondary Signoff Verification

    • Verified by: User input or barcode scan for output verification

...

Design - Creating a New Object: Container

Container Data Fields:

  • Container No.

  • Work Order

  • Routing Step

  • Operation No.

  • Output Item

  • Output Quantity

  • Unit of Measure

  • Work Order Lot Number

Batch Number Management

  1. Batch Number Format:

    • 3 digits (e.g., 001, 002, etc.)

    • Resets annually to start from 001

  2. Batch Number Assignment:

    • Automatically assigned when creating a new Work Order

  3. Lot Number Assignment:

    • Lot Number is assigned during output posting. Pre-configured fields may be used based on the Work Order.

...

Design - Key Questions:

  1. Mixed Container Situations:

    • How should inventory be deducted on the Work Order?

      • Solution: Deduct inventory using picked quantity for the Work Order

  2. Container Number and Allocation/Shipping:

    • How does the Container Number relate to allocation and shipping?

      • Solution: Use the Lot Number for shipping

...